All Change! Refurbishing the Hall

Screen Shot 2014-07-03 at 16.51.06The pages below show the original Project Specification for the refurbishment of the hall which was displayed in the Community Cafes and published in March 2012 .

Since then, we have achieved  all our primary objectives

  • interior dry lining
  • rewiring
  • removal of old panelling
  • painting and decorating
  • relighting
  • fitting and commissioning  the Air Source heating (thanks to the Aggregate Levy Fund)
  • to install new curtains and blackout

Work on the refurbishment of the Lobby, the Committee Room, and the internal toilets is continuing.

Screen Shot 2014-07-03 at 16.51.06

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s